Park House School


Low Carbon Heating - ASHP Plant and BMS Controls system

Project site:

Park House School, Newbury RG14 6NQ

Client:

United Learning Trust, London Region 1

Contract Value:

£416,834.00

Contract Type:

JCT Minor Works Building Contract with Contractor's Design MW2016

 Strip out works

  • Plant room and heat distribution pipework
  • Pumps, Fan coil heaters and radiators

Supply and Install

  • 2 No 150KW Air Source Heat Pumps
  • 2 No 1000Lt Buffer Vessels.
  • East and West Wing Twin Invertor controlled Pumps
  • ASHP Primary circuit Twin Invertor Pumps
  • 19 No. Biddle Fan coil units and 20 Low temp Radiators c/w TRV's
  • Distribution Pipework, Fittings, Valves, and Insulation
  • Twin Pump Pressurisation unit
  • 2 No. 300Lt Expansion Vessels
  • Magnetic filtration and dosing pot.
  • Electrical Trunking, wiring, Switchgear and earth bonding.
  • New lighting with Emergency Luminaires
  • Gas Solenoid valve and Gas Detection Alarm Panel
  • Complete New Control panel, Trend BMS controls system, c/w 4 No Space Zone Sensors, remote monitoring, and associated equipment
  • Builders work in connection with the new installation.
  • Acoustic Fencing around ASHP compound to comply with Planning Consent.
  • Trenching and laying of 100 Mtr of Pre insulated underground pipework to ASHP base.